Structural Alterations, Margate

Objective for this project was to knock through the lounge to dinning room and remove 2x chimney breasts from loft down to ground floor. The best way to achieve this was to stack 2x goal post steel systems on top of each other which then gave a baring for the chimney support steels to bolt too. Ground floor also had 2x big foundation pads dug and poured on site at 1m3 each.

Previous
Previous

Flat Renovation, Ramsgate